3D3-17059-M&E Engineering for Theater and Library building
N.E. 17059
M&E Engineering for Theater and Library building
EXTUDIO
Date: 2017
Boadilla del Monte, Madrid. Spain
Area: 2220 m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-17057-MEP Engineering for residential building with 17 housing units
N.E. 17057
MEP Engineering for residential building with 17 housing units
ANGEL NAVAJAS Arquitecto
Date: 2017
Madrid, Spain
Area: 1750 m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-17049-Architectural Detail engineering for Music School in Moratalaz
N.E. 17049
Architectural Detail engineering for Music School in Moratalaz
ANETO Consultores
Date: 2017
Madrid, Spain
Area: 2745 m²
Global budget: 2777970.6 MM €
Budget of the tasks undertaken: 1.412.000 €
Tasks undertaken: Detail Engineering. Technical site management
3D3-17048-MEP and Structural Engineering for residential buildings with 48 hosing units in Puzuelo
N.E. 17048
MEP and Structural Engineering for residential buildings with 48 hosing units in Puzuelo
CANO Y ESCARIO Arquitectura
Date: 2017
Madrid, Spain
Area: 14746 m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-17047-MEP Engineering for 12 row houses in Vallecas
N.E. 17047
MEP Engineering for 12 row houses in Vallecas
CANO Y ESCARIO Arquitectura
Date: 2017
Madrid, Spain
Area: 1794 m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-17045-Building Permits management and construction management for Kitchens in Fremap Hospital in Majadahonda
N.E. 17045
Building Permits management and construction management for Kitchens in Fremap Hospital in Majadahonda
FREMAP
Date: 2017
Madrid, Spain
Area: 961 m²
Global budget: 1.332.766 €
Budget of the tasks undertaken: 1.332.766 €
Tasks undertaken: Detail Engineering. Technical site management
3D3-17044-MEP Engineering for Hamburguesa Nostra Restaurant in Alcala Street
N.E. 17044
MEP Engineering for Hamburguesa Nostra Restaurant in Alcala Street
Grupo Raza Nostra
Date: 2017
Madrid, Spain
Area: 211 m²
Global budget: 168.226 €
Budget of the tasks undertaken: 168.226 €
Tasks undertaken: Detail Engineering
3D3-17042-Architectural and MEP Engineering review in La Paz Hospital
N.E. 17042
Architectural and MEP Engineering review in La Paz Hospital
BUERAU VERITAS
Date: 2017
Madrid, Spain
Area: 625 m²
Global budget: 382.289 €
Budget of the tasks undertaken: 382.289 €
Tasks undertaken: Project Review
3D3-17041-MEP and Structural Engineering for residential building of 84 housing units in Alcala
N.E. 17041
MEP and Structural Engineering for residential building of 84 housing units in Alcala
CANO Y ESCARIO Arquitectura
Date: 2017
Madrid, Spain
Area: 18046 m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-17039-MEP Engineering for Villa Mouradia
N.E. 17039
MEP Engineering for Villa Mouradia
KING YOUNG GROUP
Date: 2017
Algiers, Algeria
Area: 2833 m²
Global budget: N/A €
Budget of the tasks undertaken: N/A €
Tasks undertaken: Detail Engineering
3D3-17035-MEP Engineering review for Tecnogetafe Occupation Centre
N.E. 17035
MEP Engineering review for Tecnogetafe Occupation Centre
B500S Arquitectura Tecnica
Date: 2017
Getafe, Madrid. Spain
Area: 4899.88 m²
Global budget: N/A €
Budget of the tasks undertaken: N/A €
Tasks undertaken: Project Review. Technical assistance for building works
3D3-17034-Structural and M&E Engineering review for
N.E. 17034
Structural and M&E Engineering review for "Constitución de 1812" School
BUERAU VERITAS
Date: 2017
Leganés, Madrid. Spain
Area: 1429.9 m²
Global budget: 1.031.832 €
Budget of the tasks undertaken: 1.031.832 €
Tasks undertaken: Project Review
3D3-17033-MEP Engineering for residential building of 95 housing units in Boadilla
N.E. 17033
MEP Engineering for residential building of 95 housing units in Boadilla
CANO Y ESCARIO Arquitectura
Date: 2017
Madrid, Spain
Area: 20442 m²
Global budget: 13.287.300 €
Budget of the tasks undertaken: 4.492.900 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-17032-MEP and Structural Engineering for residential building of 255 housing units in Espino del Cuquillo
N.E. 17032
MEP and Structural Engineering for residential building of 255 housing units in Espino del Cuquillo
Aranguren & Gallegos Arquitectos
Date: 2017
Alcobendas, Spain
Area: 52795 m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Detail Engineering
3D3-17031-Architectural and MEP Detail Engineering for nursery school in Valladolid Avenue
N.E. 17031
Architectural and MEP Detail Engineering for nursery school in Valladolid Avenue
ANETO Consultores
Date: 2017
Madrid, Spain
Area: 1946 m²
Global budget: 2.242.566 €
Budget of the tasks undertaken: 1.490.484 €
Tasks undertaken: Detail Engineering. Technical site management
3D3-17030-Architectural and MEP Detail Engineering for nursery school in Las Rodas Street
N.E. 17030
Architectural and MEP Detail Engineering for nursery school in Las Rodas Street
ANETO Consultores
Date: 2017
Madrid, Spain
Area: 1950 m²
Global budget: 2.059.936 €
Budget of the tasks undertaken: 1.563.450 €
Tasks undertaken: Detail Engineering. Technical site management
3D3-17029-Structural and M&E Engineering review for
N.E. 17029
Structural and M&E Engineering review for "Manuel Fraga" High School
BUREAU VERITAS
Date: 2017
Madrid, Spain
Area: 670 m²
Global budget: 605.244 €
Budget of the tasks undertaken: 605.244 €
Tasks undertaken: Project Review
3D3-17027-Architectural and MEP Enginering for FREMAP Heath Care Center
N.E. 17027
Architectural and MEP Enginering for FREMAP Heath Care Center
FREMAP
Date: 2017
Almendralejo, Badajoz. Spain
Area: 544 m²
Global budget: 5.000.000 €
Budget of the tasks undertaken: 5.000.000 €
Tasks undertaken: Detail Engineering. Technical site management
3D3-17025-MEP Engineering for funeral parlour in Guadalajara
N.E. 17025
MEP Engineering for funeral parlour in Guadalajara
EDHINOR
Date: 2017
Guadalajara, Spain
Area: 3723 m²
Global budget: 874.792 €
Budget of the tasks undertaken: 874.792 €
Tasks undertaken: Detail Engineering
3D3-17023-MEP and Structural Engineering review for a Hotel in Paris
N.E. 17023
MEP and Structural Engineering review for a Hotel in Paris
BUREAU VERITAS
Date: 2017
Paris, France
Area: 4113 m²
Global budget: N/A €
Budget of the tasks undertaken: N/A €
Tasks undertaken: Project Review
3D3-17020-Architectural, MEP and Structural Engineering review and technical assistance for the refurbishment of an administrative Building in Cedaceros Street
N.E. 17020
Architectural, MEP and Structural Engineering review and technical assistance for the refurbishment of an administrative Building in Cedaceros Street
BUREAU VERITAS
Date: 2017
Madrid, Spain
Area: 2711 m²
Global budget: N/A €
Budget of the tasks undertaken: N/A €
Tasks undertaken: Project Review
3D3-17015-MEP and Structural Engineering for a residential building with 55 housing units in Vallecas
N.E. 17015
MEP and Structural Engineering for a residential building with 55 housing units in Vallecas
CANO Y ESCARIO Arquitectura
Date: 2017
Madrid, Spain
Area: 8853 m²
Global budget: 5.754.450 €
Budget of the tasks undertaken: 3.688.416 €
Tasks undertaken: Preliminary drafts. Basic Engineering. Detail Engineering
3D3-17009-Architectural and MEP Enginering for FREMAP Heath Care Center
N.E. 17009
Architectural and MEP Enginering for FREMAP Heath Care Center
FREMAP
Date: 2017
Ibiza, Spain
Area: 331 m²
Global budget: 285.389 €
Budget of the tasks undertaken: 285.389 €
Tasks undertaken: Preliminary drafts. Basic Engineering. Detail Engineering. Technical site management
3D3-17007-Structural and MEP engineering for a residential building with 23 housing units
N.E. 17007
Structural and MEP engineering for a residential building with 23 housing units
CANO Y ESCARIO Arquitectura
Date: 2017
Valencia, Spain
Area: 6164 m²
Global budget: 4.006.600 €
Budget of the tasks undertaken: 2.041.834 €
Tasks undertaken: Preliminary drafts. Basic Engineering. Detail Engineering
3D3-16046-MEP engineering for
N.E. 16046
MEP engineering for "Peces-Barba" Student Housing
CANO Y ESCARIO Arquitectura
Date: 2016
Getafe, Madrid, Spain
Area: WORK-IN-PROGRESS m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Preliminary drafts. Basic Engineering. Detail Engineering
3D3-16029-Architectural and MEP Enginering for FREMAP Heath Care Center
N.E. 16029
Architectural and MEP Enginering for FREMAP Heath Care Center
FREMAP
Date: 2016-2017
Leon. Spain
Area: 1125 m²
Global budget: 950.000 €
Budget of the tasks undertaken: 950.000 €
Tasks undertaken: Preliminary drafts. Basic Engineering. Detail Engineering. Technical site management
3D3-16028-Architectural and MEP Enginering for FREMAP Heath Care Center
N.E. 16028
Architectural and MEP Enginering for FREMAP Heath Care Center
FREMAP
Date: 2016-2017
Valencia. Spain
Area: 325 m²
Global budget: 250.000 €
Budget of the tasks undertaken: 250.000 €
Tasks undertaken: Preliminary drafts. Basic Engineering. Detail Engineering. Technical site management
3D3-16026.I-E&M Engineering for a residential building with 102 housing units
N.E. 16026.I
E&M Engineering for a residential building with 102 housing units
Aranguren & Gallegos Arquitectos
Date: 2016
Madrid. Spain
Area: 18089 m²
Global budget: 10.853.400 €
Budget of the tasks undertaken: 3.075.130 €
Tasks undertaken: Detail Engineering
3D3-16021.I-MEP Engineering for detached house in Ciudalcampo
N.E. 16021.I
MEP Engineering for detached house in Ciudalcampo
Joakin Lizasoain, Arquitecto
Date: 2016
Madrid, Spain
Area: 340 m²
Global budget: €
Budget of the tasks undertaken: 110.800 €
Tasks undertaken: Detail Engineering
3D3-16020.I-E&M Engineering for 48 terraced Houses at Las Carcavas
N.E. 16020.I
E&M Engineering for 48 terraced Houses at Las Carcavas
CANO Y ESCARIO Arquitectura
Date: 2016
Madrid. Spain
Area: 3549 m²
Global budget: 2.455.908 €
Budget of the tasks undertaken: 1.139.894 €
Tasks undertaken: Detail Engineering
3D3-16015-Site management and Technical review of the Structural and MEP Engineering design for Diego Muñoz Primary School
N.E. 16015
Site management and Technical review of the Structural and MEP Engineering design for Diego Muñoz Primary School
BUREAU VERITAS
Date: 2016
Valdemoro, Madrid. Spain
Area: 3410 m²
Global budget: 1.902.086 €
Budget of the tasks undertaken: 1.067.495 €
Tasks undertaken: Project Review
3D3-16012-Site management and Technical review of the Structural and MEP Engineering design for Antonio Fontan Primary School
N.E. 16012
Site management and Technical review of the Structural and MEP Engineering design for Antonio Fontan Primary School
BUREAU VERITAS
Date: 2016
Montecarmelo, Madrid. Spain
Area: 3226 m²
Global budget: 2.071.072 €
Budget of the tasks undertaken: 1.152.395 €
Tasks undertaken: Project Review
3D3-16009-MEP Engineering for 3 detached houses in Valldemosa Street
N.E. 16009
MEP Engineering for 3 detached houses in Valldemosa Street
AR Arquitectos
Date: 2016
Madrid. Spain
Area: 1224 m²
Global budget: 918.000 €
Budget of the tasks undertaken: 300.609 €
Tasks undertaken: Detail Engineering
3D3-16007.I-M&E engineering for the storage complex
N.E. 16007.I
M&E engineering for the storage complex "Naves de la Villa de Vicálvaro"
Excmo. Ayto. de Madrid
Date: 2016
Madrid. Spain
Area: 23600 m²
Global budget: 5.500.000 €
Budget of the tasks undertaken: 1.222.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-16004-Architectural and engineering for tasting and selling point of Hamburguesa Nostra at Parquesur
N.E. 16004
Architectural and engineering for tasting and selling point of Hamburguesa Nostra at Parquesur
Hamburguesa Nostra
Date: 2016
Madrid. Spain
Area: 60 m²
Global budget: 69.000 €
Budget of the tasks undertaken: 69.000 €
Tasks undertaken: Detail Engineering
3D3-15051-E&M Engineering for a residential building with 107 housing units
N.E. 15051
E&M Engineering for a residential building with 107 housing units
Estudio Carme Pinós
Date: 2015
Madrid. Spain
Area: 22551 m²
Global budget: 13.735.081 €
Budget of the tasks undertaken: 3.829.914 €
Tasks undertaken: Basic Engineering. Detail Engineering. Technical assistance for building works
3D3-15047-M&E Engineering for Hamburguesa Nostra Restaurant
N.E. 15047
M&E Engineering for Hamburguesa Nostra Restaurant
Aranguren & Gallegos Arquitectos
Date: 2015
Majadahonda, Madrid. Spain
Area: 252 m²
Global budget: 289.800 €
Budget of the tasks undertaken: 55.400 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-15043-M&E Engineering for the expansion of a four star NH Hotel
N.E. 15043
M&E Engineering for the expansion of a four star NH Hotel
Aranguren & Gallegos Arquitectos
Date: 2015
Málaga. Spain
Area: 5360 m²
Global budget: 6.324.800 €
Budget of the tasks undertaken: 2.904.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-15040-E&M Engineering for the refurbishment of the HVAC system of a Health Care Center
N.E. 15040
E&M Engineering for the refurbishment of the HVAC system of a Health Care Center
FREMAP
Date: 2015
Getafe, Madrid, Spain
Area: 1980 m²
Global budget: 145.183 €
Budget of the tasks undertaken: 145.183 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-15016-Mechanical and electrical engineering for
N.E. 15016
Mechanical and electrical engineering for
Aranguren & Gallegos Arquitectos
Date: 2015
Boadilla del Monte, Madrid. Spain
Area: 560 m²
Global budget: 588.000 €
Budget of the tasks undertaken: 114.027 €
Tasks undertaken: Detail Engineering
3D3-15012-Electrical and Mechanical engineering for Hamburguesa Nostra restaurant at Bilbao roundabout
N.E. 15012
Electrical and Mechanical engineering for Hamburguesa Nostra restaurant at Bilbao roundabout
Aranguren & Gallegos Arquitectos
Date: 2015
Madrid. Spain
Area: 155 m²
Global budget: 186.000 €
Budget of the tasks undertaken: 58.240 €
Tasks undertaken: Basic Engineering. Detail Engineering. Technical assistance for building works
3D3-15010-Architectural, mechanical and electrical assistance for Campofrio industrial building
N.E. 15010
Architectural, mechanical and electrical assistance for Campofrio industrial building
IDOM
Date: 2015
Virginia. USA
Area: 10780 m²
Global budget: N/A €
Budget of the tasks undertaken: N/A €
Tasks undertaken: Detail Engineering
3D3-15003-Electrical and Mechanical engineering for Hamburguesa Nostra restaurant at Maria de Molina street
N.E. 15003
Electrical and Mechanical engineering for Hamburguesa Nostra restaurant at Maria de Molina street
Aranguren & Gallegos Arquitectos
Date: 2015
Madrid. Spain
Area: 348 m²
Global budget: 400.200 €
Budget of the tasks undertaken: 79.500 €
Tasks undertaken: Detail Engineering
3D3-15001-Electrical and Mechanical engineering for a services building at an industrial plant
N.E. 15001
Electrical and Mechanical engineering for a services building at an industrial plant
Lucía Masía, Arquitecta
Date: 2015
Umm Wu'al. Saudi Arabia
Area: 350 m²
Global budget:
Budget of the tasks undertaken:
Tasks undertaken: Detail Engineering
3D3-14035-Electrical and Mechanical engineering for Hamburguesa Nostra restaurant at Boj street
N.E. 14035
Electrical and Mechanical engineering for Hamburguesa Nostra restaurant at Boj street
Aranguren & Gallegos Arquitectos
Date: 2014
Madrid. Spain
Area: 225 m²
Global budget: 258.750 €
Budget of the tasks undertaken: 115.800 €
Tasks undertaken: Detail Engineering. Technical assistance for building works
3D3-14024-Mechanical and Electrical Engineering for the
N.E. 14024
Mechanical and Electrical Engineering for the "Boadilla del Monte Health and Sport City"
EDHINOR
Date: 2014
Boadilla del Monte, Madrid. Spain
Area: 23426 m²
Global budget: 22.100.000 €
Budget of the tasks undertaken: 6.201.000 €
Tasks undertaken: Detail Engineering. Recalculation and expert evaluation
3D3-14022-Sun exposure study of the roofing of an administrative building
N.E. 14022
Sun exposure study of the roofing of an administrative building
EDHINOR
Date: 2014
Madrid. Spain
Area: 8494 m²
Global budget: 3.650.400 €
Budget of the tasks undertaken: 553.000 €
Tasks undertaken: Recalculation and expert evaluation
3D3-14021-Structural Engineering for the extension of a warehouse building in
N.E. 14021
Structural Engineering for the extension of a warehouse building in "Angel Burgueño" Karting Circuit
David Nadal, Arquitecto
Date: 2014
Pedrezuela, Madrid. España
Area: 415 m²
Global budget: 183.015 €
Budget of the tasks undertaken: 78.000 €
Tasks undertaken: Detail Engineering
3D3-14009-Structural, mechanical and electrical enginering for El Bosco Pimary School
N.E. 14009
Structural, mechanical and electrical enginering for El Bosco Pimary School
AVR Arquitectos
Date: 2014-2015
Torrejón de Ardoz, Madrid. Spain
Area: 5250 m²
Global budget: 3.750.000 €
Budget of the tasks undertaken: 2.473.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-14006-Civil engineering for a 6MW photovoltaic power plant in Region de Arica y Parinacota, Chile
N.E. 14006
Civil engineering for a 6MW photovoltaic power plant in Region de Arica y Parinacota, Chile
SOLIDA Energias Renovables
Date: 2014
XV Region. Chile
Area: 240 m²
Global budget: N/A €
Budget of the tasks undertaken: N/A €
Tasks undertaken: Detail Engineering
3D3-14005-Electrical and mechanical basic engineering for logistics warehouse in the industrial area of Zona Franca
N.E. 14005
Electrical and mechanical basic engineering for logistics warehouse in the industrial area of Zona Franca
ACIEROID
Date: 2014
Barcelona. Spain
Area: 8000 m²
Global budget: 3.600.000 €
Budget of the tasks undertaken: 598.960 €
Tasks undertaken: Basic Engineering
3D3-14001-Electrical and Mechanical engineering for cybernetic laboratory building at the university of León
N.E. 14001
Electrical and Mechanical engineering for cybernetic laboratory building at the university of León
EDHINOR
Date: 2014
León. Spain
Area: 5000 m²
Global budget: 2.705.000 €
Budget of the tasks undertaken: 1.250.000 €
Tasks undertaken: Project Review. Recalculation and expert evaluation
3D3-13025-E&M Engineering for the refurbishment of a commercial area as a Parish Center at Alameda de Osuna
N.E. 13025
E&M Engineering for the refurbishment of a commercial area as a Parish Center at Alameda de Osuna
Alberto Martínez. Arquitecto
Date: 2013
Madrid. Spain
Area: 461 m²
Global budget: 230.500 €
Budget of the tasks undertaken: 77.613 €
Tasks undertaken: Detail Engineering. Technical assistance for building works
3D3-13018-M&E basic engineering for a  modular office building for Airbus
N.E. 13018
M&E basic engineering for a modular office building for Airbus
ACIEROID
Date: 2013
Illescas, Toledo. Spain
Area: 160 m²
Global budget:
Budget of the tasks undertaken:
Tasks undertaken: Basic Engineering
3D3-13009-E&M Engineering for the refurbishment of a commercial area as a Parish Center at Torres de la Alameda
N.E. 13009
E&M Engineering for the refurbishment of a commercial area as a Parish Center at Torres de la Alameda
Alberto Martínez. Arquitecto
Date: 2013
Torres de la Alameda, Madrid. Spain
Area: 215 m²
Global budget: 53.750 €
Budget of the tasks undertaken: 17.838 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-13008-M&E engineering and structural engineering for the request for tenders for a Contemporary Art Museum in Assilah
N.E. 13008
M&E engineering and structural engineering for the request for tenders for a Contemporary Art Museum in Assilah
Hernandez de Leon & Alvaro Siza, Arquitectos
Date: 2013
Assilah. Morocco
Area: 9189 m²
Global budget: 4..0 M.M € €
Budget of the tasks undertaken: 2..8 M.M € €
Tasks undertaken: Preliminary drafts
3D3-13006-C-Civil Engineering for Kaxu Solar One thermosolar plant in Northern Cape, South Africa. Solar Field Electrical Buildings
N.E. 13006-C
Civil Engineering for Kaxu Solar One thermosolar plant in Northern Cape, South Africa. Solar Field Electrical Buildings
ABEINSA
Date: 2013
Kaxu. South Africa
Area: 80.000 m2 m²
Global budget: 589. M$ €
Budget of the tasks undertaken:
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-13002-M&E engineering for a robotic underground parking
N.E. 13002
M&E engineering for a robotic underground parking
COOT Arquitectos
Date: 2013
Madrid. Spain
Area: 1665 m²
Global budget: 1.082.250 €
Budget of the tasks undertaken: 399.600 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-12016-Electrical and Mechanical engineering for the rehabilitation of Social Security building
N.E. 12016
Electrical and Mechanical engineering for the rehabilitation of Social Security building
EDHINOR
Date: 2012
Cadiz. Spain
Area: 6014 m²
Global budget: 3.313.714 €
Budget of the tasks undertaken: 1.870.354 €
Tasks undertaken: Detail Engineering. Recalculation and expert evaluation
3D3-12014-E&M Review for the rehabilitation of a psychiatric facility in San Luis health Compound
N.E. 12014
E&M Review for the rehabilitation of a psychiatric facility in San Luis health Compound
EDHINOR
Date: 2012
Palencia. Spain
Area: 3863 m²
Global budget:
Budget of the tasks undertaken:
Tasks undertaken: Studies and Reports. Project Review
3D3-12012I-M&E engineering for Iesu Communio church building
N.E. 12012I
M&E engineering for Iesu Communio church building
Julián Fernández, Arquitecto
Date: 2012
Aranda de Duero, Burgos. Spain
Area: 2439 m²
Global budget: 1.275.000 €
Budget of the tasks undertaken: 281.900 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-12011-Civil engineering services for biomass generation plant
N.E. 12011
Civil engineering services for biomass generation plant
SOLIDA Energias Renovables
Date: 2012
San Pedro de Macorís. Dominican Republic
Area: WORK-IN-PROGRESS m²
Global budget: WORK-IN-PR MM €
Budget of the tasks undertaken: WORK-IN-PR MM €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-11024-Project Review for four technical buildings at the A30 Highway in Montreal
N.E. 11024
Project Review for four technical buildings at the A30 Highway in Montreal
UTE A30CVJ ACCIONA + DRAGADOS
Date: 2011
Montreal. Canada
Area: 2536 m²
Global budget:
Budget of the tasks undertaken:
Tasks undertaken: Studies and Reports. Project Review
3D3-11017-Structural survey, construction project and technical site management in the remodeling of the electrical substation ST Cáceres III
N.E. 11017
Structural survey, construction project and technical site management in the remodeling of the electrical substation ST Cáceres III
Iberdrola Ingeniería y Construcción
Date: 2011-2016
Cáceres. Spain
Area: 483 m²
Global budget: 450.000 €
Budget of the tasks undertaken: 450.000 €
Tasks undertaken: Studies and Reports. Basic Engineering. Detail Engineering. Technical site management
3D3-11010-M&E Engineering design review and optimization proposals for a Primary school at Miranda de Ebro
N.E. 11010
M&E Engineering design review and optimization proposals for a Primary school at Miranda de Ebro
EDHINOR
Date: 2011
Miranda de Ebro, Burgos. Spain
Area: 3725 m²
Global budget: 2.934.000 €
Budget of the tasks undertaken: 2.934.000 €
Tasks undertaken: Studies and Reports
3D3-11005-Recalculation of electrical and mechanical installations for Social Security building
N.E. 11005
Recalculation of electrical and mechanical installations for Social Security building
EDHINOR
Date: 2011
Vitoria. Spain
Area: 16400 m²
Global budget: 16.356.000 €
Budget of the tasks undertaken: 5.250.000 €
Tasks undertaken: Recalculation and expert evaluation
3D3-10029I-E&M Engineering for the expansion of a warehouse building for Saint Gobain
N.E. 10029I
E&M Engineering for the expansion of a warehouse building for Saint Gobain
ARV Arquitectos
Date: 2010
Azuqueca de Henares, Guadalajara. Spain
Area: 110 m²
Global budget: 68.310 €
Budget of the tasks undertaken: 45.596 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-10022-Mechanical and electrical engineering for Northern District Board of Alcobendas
N.E. 10022
Mechanical and electrical engineering for Northern District Board of Alcobendas
COOT Arquitectos
Date: 2011
Alcobendas, Madrid. Spain
Area: 3200 m²
Global budget: 2.800.000 €
Budget of the tasks undertaken: 785.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-10021-Project draft for IKEA® shopping center
N.E. 10021
Project draft for IKEA® shopping center
VECTOR XXI Arquitectos S.L.
Date: 2010
Valladolid. Spain
Area: 60540 m²
Global budget: 19.900.000 €
Budget of the tasks undertaken: 19.900.000 €
Tasks undertaken: Basic Engineering
3D3-10019I-Mecanical and electrical engineering for an R&D&I building at Salamanca University
N.E. 10019I
Mecanical and electrical engineering for an R&D&I building at Salamanca University
EDHINOR
Date: 2010
Salamanca, Spain
Area: 12000 m²
Global budget: 8.100.000 €
Budget of the tasks undertaken: 3.260.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-10018-Technical site management for Gino's restaurant building works
N.E. 10018
Technical site management for Gino's restaurant building works
VECTOR XXI Arquitectos S.L.
Date: 2010
Villalba, Madrid. Spain
Area: 187 m²
Global budget: 97.600 €
Budget of the tasks undertaken: 97.600 €
Tasks undertaken: Technical site management
3D3-10017-Electrical and Mechanical engineering project for Urban Facilities
N.E. 10017
Electrical and Mechanical engineering project for Urban Facilities
ARV Arquitectos
Date: 2010
Paracuellos del Jarama, Madrid. Spain
Area: 14960 m²
Global budget: 567.842 €
Budget of the tasks undertaken: 290.448 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-10013-Activity license for Gino's restaurant
N.E. 10013
Activity license for Gino's restaurant
VECTOR XXI Arquitectos S.L.
Date: 2010
Villalba, Madrid. Spain
Area: 187 m²
Global budget: 97.600 €
Budget of the tasks undertaken: 97.600 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-10010I-Mecanical and electrical engineering services for accomplishing the bidding conditions of Parque Huelin underground parking
N.E. 10010I
Mecanical and electrical engineering services for accomplishing the bidding conditions of Parque Huelin underground parking
CONTRAT S.A.
Date: 2010
Malaga. Spain
Area: 8400 m²
Global budget: 4.400.000 €
Budget of the tasks undertaken: 380.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-10010-Civil engineering services for accomplishing the bidding conditions of Parque Huelin underground parking
N.E. 10010
Civil engineering services for accomplishing the bidding conditions of Parque Huelin underground parking
CONTRAT S.A.
Date: 2010
Malaga. Spain
Area: 8400 m²
Global budget: 4.400.000 €
Budget of the tasks undertaken: 4.400.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-09028I-Mechanical and electrical engineering for hangar of the Traffic Department at Seville Airport
N.E. 09028I
Mechanical and electrical engineering for hangar of the Traffic Department at Seville Airport
Tekia Ingenieros
Date: 2009
Seville. Spain
Area: 1495 m²
Global budget: 840.000 €
Budget of the tasks undertaken: 152.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-09025-Mechanical and electrical engineering for Marine Pollution Laboratory for CEDEX
N.E. 09025
Mechanical and electrical engineering for Marine Pollution Laboratory for CEDEX
COOT Arquitectos
Date: 2009
Madrid. Spain
Area: 417 m²
Global budget: 396.984 €
Budget of the tasks undertaken: 277.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-09022-Mechanical, electrical and structural engineering for the remodeling of eight offices in Tribeca Business Park
N.E. 09022
Mechanical, electrical and structural engineering for the remodeling of eight offices in Tribeca Business Park
COOT Arquitectos
Date: 2009
Alcobendas, Madrid. Spain
Area: 3316 m²
Global budget: 497.400 €
Budget of the tasks undertaken: 175.795 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-09017I-Mechanical and electrical engineering for City hall building of Aldea del Fresno
N.E. 09017I
Mechanical and electrical engineering for City hall building of Aldea del Fresno
COOT Arquitectos
Date: 2009
Aldea del Fresno, Madrid. Spain
Area: 795 m²
Global budget: 628.845 €
Budget of the tasks undertaken: 165.933 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-09014-Mechanical, electrical and structural engineering for services building in Son Reus Power Plant
N.E. 09014
Mechanical, electrical and structural engineering for services building in Son Reus Power Plant
IMPLANTA
Date: 2009
Palma de Mallorca. Spain
Area: 716 m²
Global budget: 396.664 €
Budget of the tasks undertaken: 179.012 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-09013-Civil engineering services for cogeneration plant
N.E. 09013
Civil engineering services for cogeneration plant
OTSI
Date: 2009
Dos Hermanas, Sevilla. Spain
Area: 1175 m²
Global budget: 217.375 €
Budget of the tasks undertaken: 217.375 €
Tasks undertaken: Basic Engineering. Detail Engineering. Project Review
3D3-08040-Structural engineering for a warehouse and office block for IKEA
N.E. 08040
Structural engineering for a warehouse and office block for IKEA
VECTOR XXI Arquitectos S.L.
Date: 2008
San Sebastián de los Reyes, Madrid. Spain
Area: 8500 m²
Global budget: 4.139.500 €
Budget of the tasks undertaken: 2.611.713 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-08023-Civil engineering for a photovoltaic panel manufacturing facility
N.E. 08023
Civil engineering for a photovoltaic panel manufacturing facility
HEYMO
Date: 2008
Cádiz. Spain
Area: 11150 m²
Global budget: 5.285.100 €
Budget of the tasks undertaken: 5.285.100 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-08003-Civil engineering services for CEUTA13 gas turbine building
N.E. 08003
Civil engineering services for CEUTA13 gas turbine building
OTSI - ENDESA
Date: 2008
Ceuta. Spain
Area: 1585 m²
Global budget: 594.375 €
Budget of the tasks undertaken: 594.375 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-08001-Mechanical, electrical and structural engineering for remodeling a service building in Lanzarote Airport
N.E. 08001
Mechanical, electrical and structural engineering for remodeling a service building in Lanzarote Airport
IDOM - AENA
Date: 2008
Lanzarote, Las Palmas. Spain
Area: 280 m²
Global budget: 1.008.000 €
Budget of the tasks undertaken: 1.008.000 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-0755-Civil, Structural and E&M Engineering for a warehouse for train maintenance
N.E. 0755
Civil, Structural and E&M Engineering for a warehouse for train maintenance
EYSER - ADIF
Date: 2007
Redondela, Pontevedra. Spain
Area: 11800 m²
Global budget: 3.683.152 €
Budget of the tasks undertaken: 3.683.152 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-0745-Civil engineering services for pellet production and cogeneration plant
N.E. 0745
Civil engineering services for pellet production and cogeneration plant
OTSI
Date: 2007
Almazan, Soria. Spain
Area: 3500 m²
Global budget: 1.662.500 €
Budget of the tasks undertaken: 1.662.500 €
Tasks undertaken: Preliminary drafts. Basic Engineering. Detail Engineering
3D3-0617-Electrical and mechanical engineering for a residential building with 46 housing units
N.E. 0617
Electrical and mechanical engineering for a residential building with 46 housing units
Estudio 103
Date: 2006
Seseña, Toledo. Spain
Area: 1096 m²
Global budget: 564.440 €
Budget of the tasks undertaken: 529.035 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-0613-Civil engineering services for CD El Palmar 20-21 power generation plant
N.E. 0613
Civil engineering services for CD El Palmar 20-21 power generation plant
OTSI - ENDESA
Date: 2006
La Gomera. Canary Islands. Spain
Area: 4035 m²
Global budget: 1.161.400 €
Budget of the tasks undertaken: 1.161.400 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-0610-Structural and E&M Engineering for warehouse building
N.E. 0610
Structural and E&M Engineering for warehouse building
Jose Manuel Bolaños Viso
Date: 2006

Area: 1920 m²
Global budget: 581.943 €
Budget of the tasks undertaken: 581.943 €
Tasks undertaken: Basic Engineering. Detail Engineering. Project Review
3D3-0606-Mechanical, electrical and structural engineering for concrete mixing plant and storage shed
N.E. 0606
Mechanical, electrical and structural engineering for concrete mixing plant and storage shed
Jose Manuel Bolaños Viso
Date: 2006
Herencia, Ciudad Real. Spain
Area: 1375 m²
Global budget: 445.814 €
Budget of the tasks undertaken: 445.814 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-0521I-Mechanical and electrical engineering for a residential building complex with 192 state subsidised housing units
N.E. 0521I
Mechanical and electrical engineering for a residential building complex with 192 state subsidised housing units
Imasatec S.A.
Date: 2005-2006
Las Campas, Oviedo. Spain
Area: 23578 m²
Global budget: 14.241.112 €
Budget of the tasks undertaken: 4.708.134 €
Tasks undertaken: Basic Engineering. Detail Engineering
3D3-0514I-Mechanical and electrical engineering for a residential building with 65 state subsidised housing units
N.E. 0514I
Mechanical and electrical engineering for a residential building with 65 state subsidised housing units
Imasatec S.A.
Date: 2005-2006
Villafría, Oviedo. Spain
Area: 8130 m²
Global budget: 4.920.000 €
Budget of the tasks undertaken: 674.077 €
Tasks undertaken: Basic Engineering. Detail Engineering
 
 